top of page

2024 Case Study Highlights

Explore highlights from our 2024 warehouse projects. This year’s case studies showcase major installations, relocations, tear‑downs, and engineered systems—each designed to boost efficiency, maximize storage capacity, and deliver dependable, safety‑focused warehouse solutions.

IMG_0989_edited.jpg

January

 Same‑Week Delivery for Urgent Rack Needs

IMG_0991_edited.jpg

April

Full System Tear‑Down and Modern Rebuild

IMG_0995_edited.jpg

July

Cost‑Efficient Mixed‑Material Storage Solution

IMG_0996.PNG

October

 Major High‑Capacity Storage Buildout Phase Two

IMG_0990_edited.jpg

February

Vertical Storage Expansion for Increased Capacity

IMG_0992_edited.jpg

May

Large‑Scale Rack Dismantling and Relocation

IMG_0999.PNG

August

Industrial Safety Net Aisle Protection Install

IMG_0998.PNG

November

Heavy‑Duty System Install for High Traffic

IMG_0988.PNG

March

Warehouse Reconfiguration During Live Operations

IMG_0993_edited.jpg

June

Premium Rack Installation for Daily Throughput

IMG_0997.PNG

September

Rapid Heavy‑Duty Rack Deployment Phase One

IMG_0994_edited.jpg

December

 Long‑Product Cantilever Storage System Installation

6.1.6.2.1.I.-Warehouse-Racking-Safety-Audit-Featured-Image-removebg-preview.png
2222-removebg-preview.png

Certifications 

iso-logo-png_seeklogo-305571-removebg-preview.png
1111-removebg-preview.png
Picto_CE.webp
197-1974535_tuv-sud-logo-png-removebg-preview.png

Join our mailing list

786-470-7797

gbogardus30@gmail.com
bwsracking@gmail.com

13483 NW 19th Ln, Miami, FL 33182

  • Facebook
  • Instagram

 

© 2025 by Bogardus Warehouse Solutions. Powered and secured by Wix 

 

bottom of page