Client Background
A Fort Myers warehouse required a full modernization of its storage infrastructure. The existing pallet rack layout had become outdated, limiting safe handling, storage density, and efficient traffic movement. The customer needed a complete redesign to improve workflow performance and bring the facility into compliance with current safety and material flow standards.
Project Overview
The objective of this engagement was to fully remove the legacy rack system and replace it with a new modern layout optimized for vertical storage, forklift access, and high‑volume material handling. The new configuration required strategic design to maximize pallet density, improve warehouse flow, and align with evolving operational needs.
Project Challenges
-
Complete tear‑down had to be executed safely and efficiently without damaging usable floor area or interrupting adjacent workspace.
-
The redesign required improved aisle spacing and optimized travel routes to support modern handling equipment.
-
The new system needed to meet current safety standards while increasing total pallet positions.
-
Installation sequencing had to minimize disruption and maintain structural alignment across the new layout.
Solution and System Implementation
Bogardus executed the full tear‑down and rebuild process by:
-
Removing the existing pallet rack system in its entirety
-
Redesigning the warehouse layout to improve material flow and rack accessibility
-
Installing a modern optimized pallet rack system aligned with updated safety and equipment specifications
The new rack configuration was engineered to support improved throughput, clearer forklift movement, and stronger vertical utilization.
Results and Outcomes
-
The warehouse received a modern storage system with increased pallet capacity and improved structural safety.
-
Material flow improved significantly, reducing congestion and supporting smoother inbound and outbound handling.
-
Updated system design aligned with current safety standards and equipment demands.
-
The modernization enabled the customer to operate with improved efficiency and reduced handling delays.
Long‑Term Impact
The full redesign provided a long‑lasting foundation for efficient warehouse operations. Increased pallet density, optimized travel flow, and enhanced structural safety positioned the facility for future growth and sustained throughput. The new system offers improved accessibility, reduced operational risk, and higher performance in day‑to‑day handling activities.